Bear and ribs..hungry for oil

According to Daniel 7 there is going to be a Bear (Russia) that’s hounded by three “ribs” telling him to go and devour some flesh.  This will happen sometime in the future because it hasn’t happened yet.

Wikipedia states that “The brown bear is a popular symbol of Russia, …”

And behold another beast, a second, like to a bear, and it raised up itself on one side, and it had three ribs in the mouth of it between the teeth of it: and they said thus unto it, Arise, devour much flesh.

 

However, the problem of how to deliver the oil to European markets existed. This problem was solved by the agreement for the construction of the Baku–Tbilisi–Ceyhan pipeline between Azerbaijan, Georgia and Turkey in 1998.

The Baku–Tbilisi–Ceyhan pipeline officially opened on July 13, 2006 and now transports crude oil 1,760 km (1,090 mi) from the Azeri–Chirag–Gunashli oil field on the Caspian Sea to the Mediterranean. The oil is pumped from the Sangachal Terminal near Baku, via Tbilisi the capital of Georgia, to Ceyhan, a port on the south-eastern Mediterranean coast of Turkey. It is the second-longest oil pipeline in the world. (The longest is the Druzhba pipeline from Russia to central Europe).

More than 1.9 million tons of Azerbaijani oil from the port of Ceyhan were exported to world markets in September 2017 (1 million 204 thousand 943 tons of this volume was made by the State Oil Fund of Azerbaijan). The volume of oil exported from the Ceyhan port amounted to 19 million 140 thousand 954 tons during January-September of 2016.[13]

2 million 268 thousand 672 tons of Azerbaijani oil were transported through the BTC main export pipeline in October 2017.[14]

Entirely, 344 133 525 tons of Azerbaijani oil were transported via BTC pipeline from June 2006 till November 1, 2017. [14]

The BTC pipeline is expected to make a major contribution to world energy supply with its more than 1 million barrels (160,000 m3) per day capacity. Thanks to this project, Turkey is also expected to earn about $300 million annually. Around 15,000 people were employed during pipeline construction, which cost $3 billion.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.